MEP Contractors & Construction

New installations carry welding residues, mill scale, oil films and construction debris. We flush the system in two steps, NANO CLEAN then NANO CLEAN NR, seal micro-leaks found after pressure testing and put the loop on protective dosing, with a flushing record for the handover file.

Who we work with: MEP project manager, commissioning engineer, main contractor, consultant.

High-rise under construction with a new plant room being flushed

What you face

  • Welding residues, mill scale and metal fines in newly installed piping reach pumps, valves and exchangers in the first season.
  • Construction debris and oil films from fabrication and assembly.
  • Standby-period corrosion between installation and commissioning.
  • The consultant asks for flushing to specification and a record for handover, and the construction programme gives you days, not weeks.

Our approach

  • Step 1: NANO CLEAN chemical flush circulated through the new system to remove construction contaminants.
  • Step 2: NANO CLEAN NR neutralisation to handover-grade pH and compliant discharge.
  • WTR RESIST sealing of micro-leaks found after pressure testing, without opening finished surfaces.
  • NANOSAFE X protective dosing before handover so the loop is delivered protected; flushing record issued.

Services and products for this sector

4 services. Full descriptions on the service group pages; selection rules on each product page.

ServiceEquipmentProduct
C.1 Pre-Commissioning FlushingNew heating, cooling and HVAC installations before system start-upNANO CLEAN (cleaning)
C.2 Post-Cleaning System NeutralisationAny system after acidic chemical cleaning or flushingNANO CLEAN NR
D.1 Closed-Loop Pipe Leak SealingClosed-loop HVAC piping, hot and chilled water circulation systems, industrial pipelinesWTR RESIST
B.1 Closed-Loop System ProtectionClosed-loop heating circuits, hot water circulation systems, chilled water loopsNANOSAFE X (molybdate-based)

Products used in this sector

References in this sector

  • Talan Towers, Astana
  • TAI Helicopter Wing Test Facility
  • Gaziantep New Airport
  • Kırıkkale High Speed Train Station
  • Konya New Stadium

All references

Frequently asked questions

What is two-step chemical flushing?

Step 1: NANO CLEAN is circulated through the new system to remove welding residues, mill scale, oil films and construction debris. Step 2: NANO CLEAN NR neutralises the system to handover-grade pH and compliant discharge.

Do you provide a flushing record for the handover file?

Yes. A flushing record is issued for every flushed system.

What if micro-leaks are found after pressure testing?

WTR RESIST seals them without opening finished surfaces.

How is the loop protected between flushing and handover?

NANOSAFE X protective dosing is added before handover, so the loop is delivered protected.

Describe your system and we will review it.

Send the system type, metal, volume and the problem you see. Our technical team replies within 24 hours on business days.